首页> 外文会议>Key technologies of railway engineering: high-speed railway, heavy haul railway and urban rail transit. >NUMERICAL SIMULATION ABOUT THE CONSTRUCTION OF CHENGDU SUBWAY LINE 2 IMPACT ON THE GROUNOWATER ENVIRONMENT
【24h】

NUMERICAL SIMULATION ABOUT THE CONSTRUCTION OF CHENGDU SUBWAY LINE 2 IMPACT ON THE GROUNOWATER ENVIRONMENT

机译:成都地铁2号线施工对地下水环境影响的数值模拟

获取原文
获取原文并翻译 | 示例

摘要

As an example of the first phase project of Chengdu Subway Line 2, use three-dimensional numerical simulation of groundwater flow to simulate the situation of ground water table obstruct, Simulation includes two cases of only consider Line 2 and both consider Line 1, 2. Through the analysis that Chengdu Subway Line 2 project of ground water table obstruct in 0.035~0.298m, Will be affected some low-rise or middle-rise buildings safe and the normal use of the basement or underground car park which relatively poor water resistance.
机译:以成都地铁2号线一期工程为例,利用地下水流量的三维数值模拟来模拟地下水位受阻情况,模拟包括仅考虑2号线和同时考虑1、2号线的两种情况。通过对成都地铁二号线地下水位阻塞在0.035〜0.298m的分析,将影响部分低层或中层建筑物的安全以及地下室或地下停车场的正常使用,这些地下室或地下停车场的耐水性相对较差。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号