At the end of May 1997, tritium neutral beams were run for the first time in the JET Octant 8 Neutral Injector Box (NIB8). On 4 June 1997 there were indications of a water leak in the NIB8. The leak was associated with operation of the Fast Shutter [1] system positioned between teh Injector and the Rotary Valve.
展开▼