首页> 外文会议>International Yellow River Forum on Keeping Healthy Life of the River vol.4; 20051021-24; Zhengzhou(CN) >Viewing on the Effect of Digging River and Reinforcing Dykes in the Yellow River Estuary from Changes in Water and Sediment Condition
【24h】

Viewing on the Effect of Digging River and Reinforcing Dykes in the Yellow River Estuary from Changes in Water and Sediment Condition

机译:从水,沙条件变化看黄河河口引水加固堤的作用

获取原文
获取原文并翻译 | 示例

摘要

The engineering of digging river and reinforcing dykes located in the river section from Yihe to Zhujiawuzi was initiated early in Oct 2001 and completed in middle of May 2002. The flux in the estuary had kept small during the course. In July 2002, a water and sediment regulation experiment was conducted, which was the first experiment since the utilization of Xiaolangdi Reservoir. In the experiment the flux in Lijin Station stayed over 2,000 m~3/s for 11 days. Obviously, the main watercourse in the estuary has taken on a great change.
机译:位于宜和至朱家坞子河段的挖河加固堤工程于2001年10月上旬启动,于2002年5月中旬完成。河口流量在此期间一直很小。 2002年7月进行了调水调沙试验,这是小浪底水库利用以来的首次试验。在实验中,利津站的通量保持在2,000 m〜3 / s以上达11天。显然,河口的主要水道发生了巨大变化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号