首页> 外文会议>International Yellow River Forum on Keeping Healthy Life of the River vol.4; 20051021-24; Zhengzhou(CN) >Root Stone Displacement Monitoring Technique Research for Downstream Regulating Projects of Yellow River
【24h】

Root Stone Displacement Monitoring Technique Research for Downstream Regulating Projects of Yellow River

机译:黄河下游治理工程的根石位移监测技术研究。

获取原文
获取原文并翻译 | 示例

摘要

In order to resolve the problem of root stone displacement real - time monitoring for the river channel regulation works of the Yellow River and according to the practical condition of the Yellow River project, the paper analyzed the reason for causing the root stone displacement of project, and suggested " root stone displacement upward transfer + displacement transducer" monitoring method, underwater sonar detecting method, GPS orientation method, contacting optical fiber and other 8 kinds of root stone displacement real - time monitoring techniques, and finally confirmed the effective monitoring scheme -"root stone displacement upward transfer + displacement transducer". The scheme solved 4 technical problems: a) how to adapt the root stone displacement characteristics of the Yellow River project; b) how to confirm the reasonable principle of monitoring arrangement; c) automatic acquisition and communication technical problem; d) theoretical model for safety appraisal and warning.
机译:为了解决黄河河道整治工程中基石位移实时监测的问题,并结合黄河工程的实际情况,分析了造成工程基石位移的原因,并提出了“根石位移向上转移+位移传感器”监测方法,水下声纳探测法,GPS定位法,接触光纤等8种根石位移实时监测技术,并最终确定了有效的监测方案-”根石位移向上转移+位移传感器”。该方案解决了四个技术问题:a)如何适应黄河工程的根石位移特性; b)如何确定监督安排的合理原则; c)自动获取和通讯技术问题; d)安全评估和预警的理论模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号