Production technology for tailing unburned brick

机译:尾矿未烧砖的生产工艺

获取原文
获取原文并翻译 | 示例

摘要

Tailing from Guodian Iron Ore of Jinan Iron and Steel Group has been discharged into the big pit, which was formed due to earth fetched to produce bricks by the Bricks Workshop. All the pits are full up now. It is difficult to go on mineral separation because on area to discharge the tailing. In order to solve this problem and use the tailing resources reasonably, after technique discussion, 0.3 million Yuan was invested to produce tailing unburnt bricks with mainly the tailing, and some other materials such as steel slag powder and cement. The designed capasity is 5 million pieces per year. It does not only use the waste material but also save discharge fee up to 50 thousand yuan yearly.
机译:济南钢铁集团国电铁矿的尾矿已排入大坑,该大坑是由于砖厂将土块取来生产砖而形成的。现在所有的坑都满了。进行矿物分离很困难,因为要排出尾矿。为解决这一问题,合理利用尾矿资源,经过技术讨论,投资30万元,生产了以尾矿为主的尾矿未烧砖,以及钢渣粉,水泥等其他材料。设计产能为每年500万件。不仅使用废料,而且每年可节省排放费5万元。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号