首页> 外文会议>International symposium on sustainable geosynthetics amp; green technology for climate change >STATE OF THE LONG-TERM SETTLEMENT BEHAVIOR OF THE METRO TUNNEL IN SHANGHAI
【24h】

STATE OF THE LONG-TERM SETTLEMENT BEHAVIOR OF THE METRO TUNNEL IN SHANGHAI

机译:上海地铁隧道的长期沉降状态

获取原文
获取原文并翻译 | 示例

摘要

Based on a large amount of field data, the behavior of post-construction settlement of shield tunnel is acquired. There was a large magnitude of cumulative settlement with great differential settlement of tunnel during the long-term operation. The settlement was very fast in the previous two years with a speed of 40~50 mm then the speed slowed down. Large scales of differential settlement mainly occurred in guiding sections, communication passages, tunnel- station joints and river-crossing sections. The influence factors are attributable to the land subsidence, the construction method, the sub-soil conditions, the disturbance of nearby construction, the leakage of ground water, and the train vibration.
机译:基于大量的现场数据,获得了盾构隧道施工后沉降的行为。在长期运行过程中,存在较大的累积沉降量,隧道的沉降差异很大。在过去的两年中,沉降速度非常快,速度为40〜50 mm,然后速度减慢。大规模的差异沉降主要发生在导向段,通信通道,隧道站接头和跨河段。影响因素可归因于地面沉降,施工方法,地下土壤条件,附近施工干扰,地下水渗漏和列车振动。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号