STUDY ON SEDIMENT PROBLEM OF A POWER STATION AT CONVEX BANK OF SEDIMENT-LADEN RIVER

机译:含沙河流凸岸某电站的泥沙问题研究

获取原文
获取原文并翻译 | 示例

摘要

Because of hydrological and geologic conditions, power stations at many projects hydro with low head are unavoidably located at the convex banks of rivers. On the Yellow River, a new power station, Shapotou, has recently been built up with the operational head of 10.4 m. According to the topographic and geologic conditions, the dam is located at the end ofa river bend, and the power station is located at the convex bank of the river. Bend flow and its induced sedimentation are key problems to the project. In this test model, the experimental theory and technology of hyperconcentrated flow are applied to study the features of flow and sedimentation in the dam zone and the unfavorable influence of bend flow on the project operation is exposed as well. In view of the sediment problem of a power station at convex bank with low head, some viewpoints and technical measures are put forward, which fundamentally solve the sediment problem of the power station at convex bank.
机译:由于水文和地质条件,许多低水头水电站的发电站不可避免地位于河流的凸岸。在黄河上,最近新建了一座沙坡头电站,其运行高度为10.4 m。根据地形和地质条件,大坝位于河弯的尽头,电站位于河的凸岸。弯流及其诱发的沉降是该项目的关键问题。在该试验模型中,采用了高浓度水流的试验理论和技术,研究了坝区水流和泥沙的特征,同时也暴露了弯流对工程运行的不利影响。针对低头凸岸电站的泥沙问题,提出了一些观点和技术措施,从根本上解决了凸岸电站的泥沙问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号