首页> 外文会议>International Symposium on River Sedimentation vol.2; 20041018-21; Yichang(CN) >SEDIMENT PROBLEM AND THE PROPOSITION OF PREVENTING AND EJECTING SILT OF NANSHA HYDROPOWER PROJECT ON RED RIVER
【24h】

SEDIMENT PROBLEM AND THE PROPOSITION OF PREVENTING AND EJECTING SILT OF NANSHA HYDROPOWER PROJECT ON RED RIVER

机译:红河南沙水电站工程的泥沙问题及防治措施

获取原文
获取原文并翻译 | 示例

摘要

As one of the main international rivers in Southwest China, the Red River has the characters of rich hydropower resources, steep stream gradient and high sediment concentration. Thus, properly handling the sediment problem is the key problem during the river exploitation. In this paper, the preliminary proposition for sediment control and ejection in the Nansha hydropower Project is presented, which aims at the sediment problem in the main stream of Red River and gives a pavement for exploiting and utilizing the water resource in Red River.
机译:作为西南地区主要的国际河流之一,红河具有丰富的水力资源,陡峭的溪流坡度和较高的泥沙浓度等特点。因此,正确处理泥沙问题是河流开发过程中的关键问题。本文提出了南沙水电枢​​纽工程防沙治沙的初步方案,针对红河干流的泥沙问题,为开发利用红河水资源铺平了道路。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号