【24h】

EXPERIMENT ON ROCK PLUG BLASTING IN FENHE RESERVOIR

机译:HE河水库岩塞爆破试验研究。

获取原文
获取原文并翻译 | 示例

摘要

In this paper, the result of hydraulic model tests of rock plug blasting and of the hydraulic ballast sluicing in the tunnel with a diameter of 8m in the Fenhe reservoir and the comparison between experiment results with the prototype observation results are introduced. It is concluded that it is feasible carrying out rock plug blasting even if there is thick silt deposits in front of the sluicing tunnel like the Fenhe reservoir. Furthermore, the efficiency of ballast sluicing under the condition of thick silt deposits is still better than that under the condition of no thick silt deposits in a reservoir.
机译:本文介绍了he河水库直径8m的隧洞中岩塞爆破和水力压载闸水力模型试验的结果,并将试验结果与原型观测结果进行了比较。可以得出结论,即使像he河水库这样的泄水隧洞前面有厚厚的淤泥沉积物,也可以进行岩塞爆破。此外,在淤泥较厚的沉积物条件下,压载水闸的效率仍比在水库中没有淤泥较厚的条件下要高。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号