Rupture of the internal structures supporting the packing: origin, expertise, remediation and monitoring

机译:支持包装的内部结构破裂:起源,专业知识,补救和监测

获取原文
获取原文并翻译 | 示例

摘要

January the 3rd 2002. In the early evening, alarm is raised: a water flood of several m~3/sec is spilling over the cold water basin of Tihange NPP unit 3 cooling tower, threatening some underground installations of being ineluctably flooded. Decision is then taken to manually stop the 1000 MW/h production of the plant in order to allow a complete stop of the circulation pumps sending 35 m~3/s to the cooling tower. In the cold water basin it is a horrible sight: 2 of the packing supporting beams have fallen from their supports, causing the drop of tens of m~3 of packing whose debris clogged the water outlets of the basin, causing its overflowing. This paper present this incident, explain its origins, the short term engineering used in order to keep as short as possible the stops of the plant. Long term corrective measures were also taken to avoid any further similar rupture which can happen to any natural draught cooling tower ...
机译:2002年1月3日。傍晚,警报响起:数英里/秒/秒的洪水淹没在Tihange NPP 3号机组冷却塔的冷水盆上,威胁到一些地下设施不可避免地被洪水淹没。然后决定手动停止工厂的1000 MW / h生产,以便完全停止向冷却塔发送35 m〜3 / s的循环泵。在冷水盆中,这是一个可怕的景象:2个填料支撑梁从其支撑处掉落,导致数十m〜3的填料下落,其碎片堵塞了盆的出水口,导致其溢出。本文介绍了此事件,解释了它的起源,为了使工厂的停机时间尽可能短而使用的短期工程。还采取了长期纠正措施,以避免任何自然通风冷却塔可能发生的任何进一步类似的破裂...

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号