首页> 外文会议>International Symposium on Modern Tunneling Science and Technology (IS-Kyoto 2001), Oct 30-Nov 1, 2001, Kyoto, Japan >Analysis of the behaviour of an old railway tunnel due to the construction of a Lisbon Metro tunnel
【24h】

Analysis of the behaviour of an old railway tunnel due to the construction of a Lisbon Metro tunnel

机译:里斯本地铁隧道施工对旧铁路隧道的影响分析

获取原文
获取原文并翻译 | 示例

摘要

The Rossio railway tunnel, built in 1890 with a masonry lining, crosses several sandy and clayey strata, limestones and basalts. Recently, a new tunnel, part of the Lisbon Metro, was executed, crossing above the old tunnel at a short distance. In this paper, the geomechanical studies performed and the construction procedure are reported. The region around the tunnel intersection was analysed with a 3D numerical model, which allowed the simulation of the sequential excavation scheme, the reinforcement and support systems, and the non-linear behaviour of the geological strata. The results of a simplified seismic analysis, performed to evaluate the influence of an earthquake in both underground structures, are also presented.
机译:Rossio铁路隧道建于1890年,衬砌砌筑而成,横穿了数个沙质和黏土地层,石灰石和玄武岩。最近,一条新的隧道(里斯本地铁的一部分)被执行,在旧隧道上方短距离内穿越。在本文中,进行了地质力学研究和施工程序的报告。使用3D数值模型分析了隧道交叉口周围的区域,该模型可以模拟顺序开挖方案,加固和支撑系统以及地质地层的非线性行为。还介绍了简化的地震分析结果,用于评估地震对两个地下结构的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号