【24h】

Geotechnical block modelling at BHP Billiton Cannington Mine

机译:必和必拓坎宁顿矿的岩土块建模

获取原文
获取原文并翻译 | 示例

摘要

A geotechnical block model, based on drillhole geotechnical logs was created for the BHP Billiton Cannington lead-zinc-silver mine in North Queensland, Australia. The purpose of the model is to assist the Geotechnical Engineer in medium to long term planning of support costs and mining rates. The first run of the model, as described, was essentially a proof-of-concept trial to test the validity of using numerical interpolation as a means of estimating rock mass conditions. The model output provided insights into the large-scale structure of the Cannington rock mass, and has proved that the block model concept can provide a useful tool in mine planning. The model is currently in the early stages of integration into Cannington's mine planning process.
机译:为澳大利亚北昆士兰州的必和必拓坎宁顿铅锌银银矿建立了基于钻孔岩土测井的岩土块模型。该模型的目的是协助岩土工程师进行中长期支持成本和采矿费率的规划。如上所述,该模型的首次运行实质上是概念验证试验,用于测试使用数值插值作为估算岩体条件的有效性。模型输出提供了对Cannington岩体大规模结构的见解,并证明了块模型概念可以为矿山规划提供有用的工具。该模型目前处于整合到Cannington矿山规划流程的初期。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号