首页> 外文会议>International Symposium on Earth Reinforcement Nov 14-16, 2001, Fukuoka/Kyushu/Japan >Stabilization and surface protection of steep slopes using soil nails and prefabricated concrete part linings
【24h】

Stabilization and surface protection of steep slopes using soil nails and prefabricated concrete part linings

机译:使用土钉和预制混凝土零件衬砌来稳定和保护陡坡

获取原文
获取原文并翻译 | 示例

摘要

The report gives an overview of the German practice of the stabilization of steep slopes using long soil or rock nails instead of prestressed anchors for the stabilization of rock slopes. The nails connect the slide-endangered rock masses with the stable underground and reinforce the front areas of the slopes. The nail heads are, at the same time, used for setting up different systems of prefabricated concrete part lining walls. These walls, in a distance of 0.75 to 1.5 m ahead of the slope surfaces, are filled and backfilled with soil, and then vegetated. The report demonstrates a number of different systems, deals with the dimensioning principles, and gives some instructions for the execution of such stabilization works.
机译:该报告概述了德国使用长土或岩钉而不是预应力锚杆来稳定岩石边坡的陡坡稳定做法。钉子将处于滑坡危险的岩体与稳定的地下连接起来,并加固了斜坡的前部区域。钉头同时用于设置不同系统的预制混凝土零件衬砌墙。在距斜坡表面0.75至1.5 m的距离处,这些墙壁被土壤填充和回填,然后被植被覆盖。该报告展示了许多不同的系统,处理了尺寸标注原则,并提供了有关执行此类稳定工程的一些说明。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号