IMPROVEMENTS ON CONVERTER OPERATING PRACTICE AT MUFULIRA SMELTER

机译:MUFULIRA冶炼厂转炉操作实践的改进

获取原文
获取原文并翻译 | 示例

摘要

The Isasmelt Furnace was commissioned in September 2006 with a concentrates treatment capacity of 850,000 tonnes per annum. However, the converter section became a bottleneck to the high throughput. Over 25% of the Isasmelt Furnace down time was attributed to lack of converter space. Factors that affected converter operations were low tuyere line campaign life (an average of 150 blows), high reverts generation, low conversion rates, and high converter cycle time. As a result of efforts carried out to improve converter operation, the average campaign life has increased to over 250 blows and reverts generation has been reduced from 22% of concentrate treated to 15%. Blister copper conversion rate has increased from 15 tonnes per hour to 19 tonnes per hour and blowing time per cycle has been reduced from 5.7 hours to 4.7 hours.
机译:Isasmelt熔炉于2006年9月投产,年精矿处理能力为850,000吨。但是,转换器部分成为高吞吐量的瓶颈。 Isasmelt熔炉的停机时间超过25%是由于转换器空间不足。影响转炉运行的因素包括风口管线运动寿命短(平均150次击打),高转化率产生,低转化率和高转炉周期时间。通过努力改善转炉的运行,平均运动寿命已增加到250次以上,并且还原物的生成从精矿的22%减少到15%。粗铜的转化率从每小时15吨增加到每小时19吨,每个周期的吹炼时间从5.7小时减少到4.7小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号