首页> 外文会议>International Peat Congress; 20040606-11; Tampere(FI) >POST INDUSTRIAL MANAGEMENT OF A PEATLAND SITE IN COUNTY MAYO, WEST OF IRELAND: INTEGRATING PEATLAND REHABILITATION AND SUSTAINABLE ENERGY PRODUCTION AFTER-USES
【24h】

POST INDUSTRIAL MANAGEMENT OF A PEATLAND SITE IN COUNTY MAYO, WEST OF IRELAND: INTEGRATING PEATLAND REHABILITATION AND SUSTAINABLE ENERGY PRODUCTION AFTER-USES

机译:爱尔兰西部马约县的泥炭地站点的后期工业管理:整合泥炭地修复和使用后的可持续能源生产

获取原文
获取原文并翻译 | 示例

摘要

In compliance with Integrated Pollution Control Licensing, Bord na Mona must submit a rehabilitation plan to the Environmental Protection Agency for industrially developed peatlands. The aim of rehabilitation is the development of sustainable after-uses. This paper outlines the development of a rehabilitation plan for the Oweninny Works in NW Mayo and describes how an extensive wind farm was incorporated into the plan. It highlights the wise after-use of industrial peatlands and illustrates the integration of the green energy potential of post-industrial bog with the re-instatement of replacement peatland habitats.
机译:按照《综合污染控制许可》的规定,Bord na Mona必须向环境保护局提交针对工业发达泥炭地的恢复计划。康复的目的是发展可持续的使用后用途。本文概述了西北梅奥(OW Mayo)的Oweninny Works修复计划的制定,并描述了如何将大规模风电场纳入该计划。它突出显示了工业泥炭地的明智使用后的情况,并说明了后工业沼泽的绿色能源潜力与恢复泥炭地栖息地的恢复之间的整合。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号