首页> 外文会议>International oil spill conference (IOSC 2008) >T/B MORRIS J. BERMAN OIL SPILL: RESTORATION PROJECTS OVERVIEW
【24h】

T/B MORRIS J. BERMAN OIL SPILL: RESTORATION PROJECTS OVERVIEW

机译:T / B MORRIS J. BERMAN漏油:修复项目概述

获取原文
获取原文并翻译 | 示例

摘要

The January 7, 1994, barge Morris J. Herman grounding and oil spill off Punta Escambron, near San Juan, Puerto Rico, resulted in injury to natural resources along the shoreline and impaired their use for an extended time. Three major injury categories were pursued by the Trustees and the restoration projects for these injuries are presented in this paper. Including interest, approximately $10M in settlement funds are being used to fund 6 restoration projects. About $6 million of the settlement funds is being used for three projects to restore eolianite reef habitat, a type of fossilized sand dune, and other reef resources injured by the barge grounding and subsequent spill. One project, called the Condado Coral Trail project, will install artificial reef modules in the Condado Lagoon, approximately 1 mile southeast of the barge grounding site. Also in the Condado Lagoon, a 32-acre dredge hole will be brought back to historic elevations through beneficial use of dredged marine sediments. The third reef project entails acquisition of shoreline and coastal property which is intended to provide reef resource services comparable to those lost as a result of the oil spill and grounding. This parcel provides habitat for over 40 rare species of plants and animals including a major nesting beach for the endangered Leatherback Sea Turtle. The acquisition project also serves as the sole compensatory restoration project for lost recreational beach use. The parcel is being designated as a Puerto Rico Natural Reserve thereby allowing the public to use the land, including its unspoiled beaches, for recreational purposes. Finally, three restoration projects are being implemented to compensate for the lost historic visitor use services at the San Juan National Historic Site. More than 123,000 visitors to the El Morro and San Cristobal forts were affected by the spill for approximately six weeks. The first of the three projects includes Improving and Extending the Coastal Promenade, a walkway at the base of El Morro. The second is restoration of El Morro Water Battery and the third is cleaning and stabilizing certain exterior walls of the El Morro Fort.
机译:1994年1月7日,莫里斯·J·赫尔曼(Morris J. Herman)驳船在波多黎各圣胡安(San Juan)附近的蓬塔埃斯坎布隆(Punta Escambron)上接地和漏油,导致沿岸自然资源受到伤害,并延长了其使用时间。受托人追求三种主要伤害类别,本文介绍了这些伤害的修复项目。包括利息在内,大约1000万美元的和解资金被用于资助6个修复项目。定居资金中约有600万美元被用于三个项目,以恢复风成岩礁生境,一种化石沙丘以及因驳船着陆及随后的溢漏而受伤的其他礁石资源。一个名为Condado Coral Trail项目的项目将在驳船着陆点东南约1英里的Condado泻湖中安装人造礁石模块。同样在孔达多泻湖中,将通过有效利用疏marine的海洋沉积物将一个32英亩的疏edge孔带回到历史高度。第三个礁石项目需要获得海岸线和沿海财产,其目的是提供与因漏油和接地而损失的礁石资源相当的礁石资源服务。该地块可为40多种稀有动植物提供栖息地,包括濒临灭绝的棱皮海龟的主要筑巢海滩。收购项目还可以作为补偿性的休闲海滩使用补偿项目。该地块被指定为波多黎各自然保护区,从而使公众可以将土地(包括未受污染的海滩)用于娱乐目的。最后,正在实施三个修复项目,以补偿圣胡安国家历史遗址失去的历史游客使用服务。大约六周来,超过123,000名参观El Morro和San Cristobal堡垒的游客受到了泄漏的影响。这三个项目中的第一个项目包括“改善和扩展沿海长廊”,这是位于El Morro基地的人行道。第二个是修复El Morro水电池,第三个是清洁和稳定El Morro Fort的某些外墙。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号