首页> 外文会议>International Council on Systems Engineering Eighth Annual International Symposium July 26-30, 1998 Vancouver, British Columbia Canada >Process management for Skeptics (or the Cae for Process Management in Modern naval System Development)
【24h】

Process management for Skeptics (or the Cae for Process Management in Modern naval System Development)

机译:怀疑论者的过程管理(或现代海军系统开发中的过程管理案例)

获取原文
获取原文并翻译 | 示例

摘要

The need for large, complex systems has fostered a need for large, multi-disciplined organizations to design, build, and maintain them. At the same time, caustomers of large, complex systems are demanding unprecedented level of effecency and quality. To achieve these demands, builders of complex systems must employ a formal mechanism for managing their design and development processes. Understanding and controlling top-level proccesses across large multi-disciplined organizations, alliances, or consortial, is referred to as "Process management". To be successful, any process management activity must have the understanding, input and support of all key participants. This paper was originally developed as a step in getting that understanding and support, especially frpom domain specialists whithout any process engineering experience. The arguments prresented here are applicable specifically to a large Navy development program, but they may be useful in gaining process management understanding for the development of other complex systems.
机译:对大型,复杂系统的需求催生了对大型,多学科组织进行设计,构建和维护的需求。同时,大型,复杂系统的客户要求更高的效率和质量。为了满足这些需求,复杂系统的构建者必须采用正式的机制来管理其设计和开发过程。跨大型,多学科组织,联盟或财团的顶级流程的理解和控制称为“流程管理”。为了取得成功,任何过程管理活动都必须得到所有关键参与者的理解,投入和支持。本文最初是为获得这种理解和支持而开发的,尤其是没有任何过程工程经验的frpom领域专家。此处提出的论点特别适用于大型海军开发计划,但对于了解其他复杂系统的开发过程管理知识可能很有用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号