首页> 外文会议>International Congress on Conservation and Rehabilitation of Dams, Nov 11-13, 2002, Madrid, Spain >Experience with subsequently installed drainage systems inside of masonry dams
【24h】

Experience with subsequently installed drainage systems inside of masonry dams

机译:后来在砌筑大坝内安装排水系统的经验

获取原文
获取原文并翻译 | 示例

摘要

At the beginning of the 20th century many masonry dams with build-in drainage systems were constructed in Germany. Several circumstances caused the malfunction of these systems after more than 60 to 90 years in operation. In 1965 The Ruhr-River-Association started the rehabilitation of these dams by blasting a drainage gallery into the dam of the Lister Reservoir. From 1997 to 1998 the Ennepe Dam was reconstructed by mining the drainage gallery with a tunnel boring machine (TBM). The rehabilitation concept was based upon a detailed feasibility study, applying different numerical simulation methods. The official permission required the proof of the performance of the structure by several measurements. The comparison of the real measurings with the assumptions from the "a-priori"-simulations proves the successful rehabilitation and is a valuable tool for reservoir monitoring in the next years of operation.
机译:20世纪初,德国建造了许多带有内置排水系统的砖石坝。运行超过60至90年后,有几种情况导致这些系统发生故障。 1965年,鲁尔河协会通过将排水沟爆破进入李斯特水库大坝,开始了这些大坝的修复工作。从1997年到1998年,通过使用隧道掘进机(TBM)开采排水沟来重建Ennepe大坝。修复概念基于详细的可行性研究,采用了不同的数值模拟方法。官方许可要求通过多次测量来证明结构的性能。将实际测量结果与“先验”模拟的假设进行比较,证明了修复成功,并且是在未来几年中进行油藏监测的宝贵工具。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号