首页> 外文会议>International Conferences on Practice and Theory of Automated Timetabling(PATAT 2005); 20060830-0901; Brno(CZ) >A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling
【24h】

A Flexible Model and a Hybrid Exact Method for Integrated Employee Timetabling and Production Scheduling

机译:集成的员工时间表和生产计划的灵活模型和混合精确方法

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

We propose a flexible model and several integer linear programming and constraint programming formulations for integrated employee timetabling and production scheduling problems. A hybrid constraint and linear programming exact method is designed to solve a basic integrated employee timetabling and job-shop scheduling problem for lexicographic minimization of makespan and labor costs. Preliminary computational experiments show the potential of hybrid methods.
机译:我们提出了一个灵活的模型以及几种整数线性规划和约束规划公式来解决集成的员工时间表和生产计划问题。设计了一种混合约束和线性规划精确方法,以解决基本的集成员工时间表和车间作业调度问题,以最小化拼版时间和人工成本。初步的计算实验表明了混合方法的潜力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号