【24h】

THE STRUCTURAL DESIGN OF THE MEGA TOWER, CHINA WORLD TRADE CENTRE PHASE 3, BEIJING CHINA

机译:中国北京世界贸易中心三期巨型大厦的结构设计

获取原文
获取原文并翻译 | 示例

摘要

The Mega Tower, China World Trade Centre Phase 3, Beijing China is 330m high and composed of a five-star hotel, grade-A office levels and multi-purpose spaces. The height of the building and the high seismic design intensity in Beijing poses a great challenge to the structural engineers, especially considering various stringent requirements by Chinese codes. Various structural types, utilising different materials, have been explored until the final design was accomplished, which comprises a composite braced frame core and a composite perimeter frame, linked by two outrigger systems at relevant E&M floors. The tapered elevation of the tower building necessitates three transfer belt trusses that allow the reduction in number of perimeter columns in middle and high zone of the tower. The use of 8 storeys high V-shaped columns with transfer belt truss admit of the grand entrances with wide spacing of columns at ground floor for the five-star hotel and grade-A office, and meanwhile provide a smooth structural transition to the perimeter moment frame above. Composite elements of various types are extensively used and positioned carefully to satisfy the combined requirements for stiffness, ductility, redundancy, and cost-effectiveness. The composite steel plate wall (C-SPW) is implemented in the structure, possibly the first time in China, to increase the shear capacity and stiffness and improve the ductile behaviour at specific zone. Accurate finite-element analysis and advanced non-linear elasto-plastic time history analysis have been carried out to evaluate the structural behaviour and ensure the building safety under different seismic levels.
机译:中国北京世界贸易中心三期大楼,兆丰塔,高330m,由五星级酒店,甲级办公楼和多功能空间组成。北京的建筑物高度和高抗震设计强度给结构工程师带来了巨大挑战,尤其是考虑到中国法规的各种严格要求。在采用最终材料完成设计之前,一直在探索各种采用不同材料的结构类型,其中包括一个复合支撑框架核心和一个复合周边框架,这些框架通过相关E&M地板上的两个外伸支架系统相连。塔楼建筑物的锥形标高需要三个传送带桁架,以减少塔楼中部和高层区域的周边柱数。五层酒店和A级办公室使用8层高V型柱和传送带桁架,可进入一楼宽敞入口的宽敞入口,为五星级酒店和A级办公楼提供了舒适的结构过渡上面的框架。广泛使用各种类型的复合元件,并小心地放置它们,以满足对刚性,延展性,冗余度和成本效益的综合要求。结构中可能采用了复合钢板墙(C-SPW),这在中国尚属首次,以提高剪切能力和刚度并改善特定区域的延性。进行了精确的有限元分析和先进的非线性弹塑性时程分析,以评估结构性能并确保不同地震等级下的建筑物安全。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号