首页> 外文会议>International Conference on Sustainable Power Generation and Supply. >Economic analysis and calculation of the cogeneration upgrade for large fossil fired generation unit
【24h】

Economic analysis and calculation of the cogeneration upgrade for large fossil fired generation unit

机译:大型化石燃料发电机组热电联产升级的经济分析和计算

获取原文
获取原文并翻译 | 示例

摘要

The theoretical calculation involved in the district heating upgrading of the existing large fossil fired generation units was described. A feasibility study example for an existing 600MW unit was put forward in detail. It is shown that in the feasibility study of heating upgrading scheme, more effort should be made to analyze the part load performance change of the unit except for the full load performance change, in order to get a complete overview of the upgrading effect. It is also shown that for the cogeneration upgrading schemes where the IP and LP turbine crossover piping is the steam source, there exists one balancing operation condition for each operation load condition. When the heating steam supply is lower than the balancing operation condition, the economic negative benefit due to heating supply increases rapidly, and the unit operation under this kind of condition should be avoided if possible.
机译:描述了涉及现有大型化石燃料发电单元的区域供热升级的理论计算。详细介绍了现有600MW机组的可行性研究实例。结果表明,在供热升级方案的可行性研究中,除全负荷性能变化外,应加大分析机组部分负荷性能变化的力度,以全面了解改造效果。还显示出,对于以IP和LP涡轮交叉管道为蒸汽源的热电联产升级方案,对于每个运行负荷条件都存在一个平衡运行条件。当供热蒸汽供应量低于平衡运行条件时,由于供热供应带来的经济负面收益会迅速增加,如果可能,应避免在这种条件下进行机组运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号