首页> 外文会议>International Conference on Probabilistic Safety Assessment and Management(PSAM7-ESREL'04) v.5; 20040614-20040618; Berlin; DE >An Approach to Estimate SBO Risks in Multi-unit Nuclear Power Plants with a Shared Alternate AC Power Source
【24h】

An Approach to Estimate SBO Risks in Multi-unit Nuclear Power Plants with a Shared Alternate AC Power Source

机译:共享交流电源的多单元核电站中SBO风险估算的方法

获取原文
获取原文并翻译 | 示例

摘要

An appropriate method to evaluate accurately the amounts of risks, core damage frequencies and site risks, resulting from a station blackout (SBO) event of a multi-unit site that has a shared alternate AC (AAC) power source has been developed. It accommodates the complex inter-unit behaviour of the shared AAC power source under a multi-unit loss of offsite power (LOOP) conditions.
机译:已经开发出一种适当的方法,该方法可以准确地评估由具有共享备用交流(AAC)电源的多单元站点的站点停电(SBO)事件导致的风险,核心损坏频率和站点风险的数量。它适应了多单位非现场停电(LOOP)条件下共享AAC电源的复杂单元间行为。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号