首页> 外文会议>International Conference on Probabilistic Safety Assessment and Management(PSAM7-ESREL'04) v.5; 20040614-20040618; Berlin; DE >An Analysis of Source Term Reduction by Implementing Accident Management Measures to BWR-5 Plant
【24h】

An Analysis of Source Term Reduction by Implementing Accident Management Measures to BWR-5 Plant

机译:对BWR-5工厂实施事故管理措施来减少源期限

获取原文
获取原文并翻译 | 示例

摘要

The accident management measures (AMs) were implemented to all the light water NPPs in Japan by the spring of 2003 in response to the recommendation of the regulatory authority. This paper mainly deals with the effect of AMs applied to a BWR-5 MarkⅡ plant in terms of source term reduction which was analyzed by the MELCOR1.8.3 code.
机译:根据监管部门的建议,到2003年春季,对日本所有轻水核电厂都实施了事故管理措施(AMs)。本文主要从MELCOR1.8.3代码分析的源术语减少的角度出发,探讨了AM应用于BWR-5MarkⅡ工厂的影响。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号