首页> 外文会议>International Conference on Power Transmission amp; Distribution Technology; 20051011-15; >The Application and Development of Load Control Technology in Beijing Power Grid
【24h】

The Application and Development of Load Control Technology in Beijing Power Grid

机译:负荷控制技术在北京电网中的应用与发展

获取原文
获取原文并翻译 | 示例

摘要

Beijing has been suffered from a chronic shortage of electricity. As early as 1980s, Beijing Electric Power Corporation, with imported technology, gradually has applied load control into Beijing power grid safety operation and control. With the restructure of power sector and market-oriented operation, supplying excellent service to consumers has become one of the important strategy targets. The forced load control system targeting instant restrict consumers who using electricity, has been transformed into flexible load management system facing the entire society. Traditional load control technology needs to be completed in order to realize the transform.
机译:北京长期遭受电力短缺的困扰。早在1980年代,北京电力公司就采用了进口技术,逐渐将负荷控制应用到北京电网的安全运行和控制中。随着电力行业的结构调整和市场化运作,向消费者提供优质服务已成为重要的战略目标之一。针对即时用电的强制负荷控制系统已经限制了用电的消费者,已经转变为面向整个社会的灵活的负荷管理系统。为了实现转换,需要完成传统的负载控制技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号