首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Security and Stability Control System in the Sichuan-East China Electricity Transmission Project
【24h】

Security and Stability Control System in the Sichuan-East China Electricity Transmission Project

机译:川东输变电工程安全稳定控制系统

获取原文
获取原文并翻译 | 示例

摘要

This paper describes the security and stability control system in the Sichuan-East China Electricity Transmission Project including the configuration and main functions of the overall system, 500kV Honggou main control station, Ertan sub control station, three types of 200kV load shedding control stations and the communication channels. A brief retrospect of the engineering implementation and application of the system is given. It is pointed out that this system has made a great contribution to the transmission of Ertan power plant generation and the secure and stable operation of the Sichuan-Chongqing power system.
机译:本文描述了川东输变电工程的安全稳定控制系统,包括整个系统的配置和主要功能,500kV红沟主控制站,二滩子控制站,三种200kV减载控制站以及三类200kV减载控制站。沟通渠道。简要回顾了该系统的工程实现和应用。需要指出的是,该系统为二滩发电厂的输电和川渝电网的安全稳定运行做出了巨大贡献。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号