首页> 外文会议>International Conference on Hydropower Technology amp; Key Equipment; ; >Centralized Generation Control System for Cascaded Hydropower Stations in Upstream of Yellow River
【24h】

Centralized Generation Control System for Cascaded Hydropower Stations in Upstream of Yellow River

机译:黄河上游梯级水电站集中发电控制系统。

获取原文
获取原文并翻译 | 示例

摘要

This paper depicts the necessity to build up the centralized automatic generation control system for cascaded hydropower stations of upstream of Yellow River. Then the automation system structure and network security schemes are described. The issues related to operation modes of cascade dispatching system and their effects on power system dispatching policy are investigated. New functions of H9000 system developed for this cascade automatic generation control and project progress are presented at the end of paper.
机译:本文描述了建立黄河上游梯级水电站集中式自动发电控制系统的必要性。然后描述了自动化系统的结构和网络安全方案。研究了与级联调度系统运行方式有关的问题及其对电力调度策略的影响。最后介绍了为此级联自动发电控制开发的H9000系统的新功能和项目进度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号