首页> 外文会议>International Conference on Greenhouse Gas Control Technologies; 20040905-09; Vancouver(CA) >CO_2 UNDERGROUND SEQUESTRATION AND GREENHOUSE GASES MITIGATION IN JAPAN
【24h】

CO_2 UNDERGROUND SEQUESTRATION AND GREENHOUSE GASES MITIGATION IN JAPAN

机译:日本的CO_2地下隔离和温室气体减排

获取原文
获取原文并翻译 | 示例

摘要

In June 2002, Japan ratified the Kyoto Protocol this committing it self to reducing its GHG emissions between 2008 and 2012 by 6% to below the 1990 emissions level. Since then the Japanese government has paid special attention to policies and measures for GHG reductions through fuel switching, land-use and forest management, as well as improvements in energy efficiency and implementing CO_2 underground storage technology. This paper presents the CO_2 gas in first order and other GHG emissions in Japan trough time and in different economic sectors, it then goes on to the different abatement methods needed to achieve the UNFCC goal of atmospheric greenhouse gas concentrations stabilization with a particular emphasis placed on CO_2 underground storage projects. We quote two CO_2 underground sequestration pilot projects; one is the two-year enhanced coal bed methane recovery project in the Ishikari coal basin in Hokkaido and the other is the five-year CO_2 sequestration with enhanced gas recovery pilot project in an active natural gas field located at Iwanohara Base in Nagaoka City, Niigata Prefecture.
机译:日本于2002年6月批准了《京都议定书》,承诺将在2008年至2012年之间将其温室气体排放量减少6%,以低于1990年的排放水平。自那时以来,日本政府一直特别关注通过燃料转换,土地使用和森林管理减少温室气体的政策和措施,以及提高能源效率和实施CO_2地下存储技术。本文介绍了日本低谷时期和不同经济部门的一阶CO_2气体和其他GHG排放,然后介绍了实现UNFCC稳定大气温室气体浓度目标所需的不同减排方法,其中特别强调CO_2地下存储项目。我们引用了两个CO_2地下封存试点项目。一个是在北海道石狩煤田的为期两年的强化煤层气回收项目,另一个是在新泻县长冈市岩之原基地的一个活跃天然气田进行的为期五年的CO_2固存和提高天然气采收率试点项目州。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号