首页> 外文会议>International Conference on Greenhouse Gas Control Technologies; 20040905-09; Vancouver(CA) >MONITORING GEOLOGICAL STORAGE THE IN SALAH GAS CO_2 STORAGE PROJECT
【24h】

MONITORING GEOLOGICAL STORAGE THE IN SALAH GAS CO_2 STORAGE PROJECT

机译:监测萨拉赫CO_2储存项目中的地质储存

获取原文
获取原文并翻译 | 示例

摘要

In Salah Gas (ISG) is a Joint Venture (JV) Project between BP (33%), Sonatrach (35%) and Statoil (32%). The project comprises a phased development of eight gas fields located in the Ahnet-Timimoun Basin in the Algeria Central Sahara. The initial development focuses on the exploitation of the gas reserves within the 3 northern fields of Krechba, Teguentour and Reg to deliver the contracted sales gas stream of 9 bcm/yr. These gas fields contain CO_2 concentrations ranging between 1 to 9% which is above the export gas specification of 0.3% and therefore require CO_2 removal facilities. In addition to the CO_2 removal facilities, and instead of employing atmospheric disposal of the CO_2 ISG has made a further discretionary investment to enable compression and re-injection of the produced CO_2 stream (up to 70mmscf/d or 1.2 million tonnes per year) for geological storage. The CO_2 stream is re-injected back into the aquifer zone of one of the shallow gas producing reservoirs. This will be the world's first CO_2 storage operation in an actively produced gas reservoir. Production operations and CO_2 re-injection are planned to start during the middle of 2004. Tools used in the design of the project have been presented at earlier conferences, including GHGT-6 in Kyoto. This paper provides an update on the In Salah Gas Project and the accompanying CO_2 Storage Assurance Project, which it is proposed will be managed under the umbrella of a Joint Industry Project. This CO_2 project differs significantly in geological character and storage process from the existing Sleipner and Weyburn monitoring projects and offers an ideal opportunity to gain important additional information on the permanence and safety of CO_2 geologic storage. The ISG Project provides an important opportunity to study a gas field development project where geological storage at a field scale is employed to mitigate the environmental impact of the produced CO_2 stream, which represents ~60% of the projects emissions footprint.
机译:萨拉赫天然气(ISG)是BP(33%),Sonatrach(35%)和Statoil(32%)之间的合资项目。该项目包括分阶段开发位于阿尔及利亚中撒哈拉的Ahnet-Timimoun盆地的八个气田。最初的发展重点是在克雷奇巴,特根古图和Reg的3个北部气田中开采天然气,以提供每年9 bcm的合同销售气流。这些气田的CO_2浓度在1%至9%之间,高于出口气体规范的0.3%,因此需要去除CO_2的设施。除了去除CO_2的设施外,ISG还没有采取大气处置的方式,而是进行了进一步的自由投资,以压缩和重新注入所产生的CO_2流(每年最高70mmscf / d或120万吨),用于地质存储。将CO_2流重新注入到其中一个浅层产气层的含水层区域。这将是世界上第一个在活跃生产的气藏中进行CO_2封存的业务。计划于2004年中开始生产运营和再注入CO_2。项目设计所使用的工具已经在较早的会议上进行了介绍,包括在京都的GHGT-6。本文提供了有关In Salah天然气项目以及随附的CO_2储存保证项目的最新信息,建议将在联合工业项目的框架下进行管理。该CO_2项目的地质特征和存储过程与现有的Sleipner和Weyburn监测项目明显不同,并且为获取有关CO_2地质存储的持久性和安全性的重要附加信息提供了理想的机会。 ISG项目提供了一个重要的机会来研究一个气田开发项目,该项目采用现场规模的地质存储来减轻产出的CO_2流对环境的影响,这占该项目排放足迹的约60%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号