A mixed integer programming model for integrating MRP and job shop scheduling

机译:用于集成MRP和作业车间调度的混合整数规划模型

获取原文
获取原文并翻译 | 示例

摘要

This paper presents a Mixed Integer Programming (MIP) model which succeeds in a systematic integration of the production planning and job shop scheduling problems. The proposed model explicitly considers capacity constraints, operation sequences, lead times and due dates in a dynamic demand environment. The objective of the model is to seek the minimum both production flow time and penalty costs including tardiness and earliness costs. The output of the model is operation schedules with order starting time and finish time. The integrated model is verified with a commercial software package and tested with a small example. The model will be further improved and meta-heuristics will be used to solve the model more efficiently.
机译:本文提出了一种混合整数编程(MIP)模型,该模型成功地将生产计划和车间作业调度问题进行了系统集成。所提出的模型明确考虑了动态需求环境中的能力约束,操作顺序,提前期和到期日。该模型的目的是寻求最小的生产流程时间和惩罚成本,包括延误和早期成本。模型的输出是带有计划开始时间和完成时间的操作计划。集成模型已通过商业软件包进行了验证,并通过一个小示例进行了测试。该模型将得到进一步改进,并将使用元启发式方法更有效地求解该模型。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号