首页> 外文会议>International Conference on Electrical, Electronics, Signals, Communication and Optimization >A review on scheduling of hydrothermal power plants implementing fuzzy based approaches
【24h】

A review on scheduling of hydrothermal power plants implementing fuzzy based approaches

机译:基于模糊方法的水火电厂调度研究综述

获取原文

摘要

This paper gives a review based literature on latest researches done till now for scheduling of power plants. The most common of them is the Short-Term Multi Objective Hydro Thermal Scheduling, Nuclear power plant Scheduling, etc. Enormous algorithms and techniques had been implemented for the Short Term HTS. These techniques consist of both conventional and non-conventional techniques. The emphasis in this work is to cover the latest researches based on fuzzy logic which are helpful for scheduling of Hydro and Thermal Power plants for Short-term. The latest researches are in the direction to the fuzzy adaptability of existing conventional/soft-computing based approaches so that these algorithms become easier to understand and implement in physical world.
机译:本文基于综述性文献,介绍了迄今为止为电厂调度所做的最新研究。其中最常见的是短期多目标水热调度,核电站调度等。短期HTS实施了巨大的算法和技术。这些技术包括常规技术和非常规技术。这项工作的重点是涵盖基于模糊逻辑的最新研究,这些研究有助于短期内调度水力和火力发电厂。最新的研究朝着现有的基于常规/软计算的方法的模糊适应性方向发展,从而使这些算法在物理世界中变得更易于理解和实现。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号