Design criteria for remedial works for a 75-year old earthfill dam

机译:一座75年历史的土石坝补救工程的设计标准

获取原文
获取原文并翻译 | 示例

摘要

The safety of existing dams is a major issue faced by today's dam engineers not only in Australia but also in other countries, both developed and developing. Churchman Brook Dam is a 26m high earthfill dam with a puddle clay core and impounds a reservoir of 2.2 GL. Various remedial works have been undertaken since completion of construction in 1928. In September 2000, a sinkhole in the right abutment was observed during a routine dam inspection. Following this incident, detailed site investigations were carried out. These investigations revealed that there are soft zones and possibly voids formed in the upper part of the clay core. A comprehensive dam safety study and a risk workshop undertaken in 2002/2003 showed the dam to be deficient in aspects associated with piping, spillway adequacy and outlet works condition. It was agreed at the early stages of the design phase that a rational set of design criteria be developed considering both safety and economical aspects. A rational geotechnical model was developed for the foundation utilising triaxial test data from 1980s and recent investigations. The existing spillway chute will be upgraded with a concrete liner attached to the existing chute incorporating no-fine concrete as a free-draining medium. This paper presents the various aspects of the remedial works with main emphasis on the development of the design criteria considering both safety of the dam and economy of the proposed remedial works.
机译:现有大坝的安全性是当今的大坝工程师不仅在澳大利亚而且在其他发达国家和发展中国家都面临的主要问题。丘奇曼布鲁克水坝(Churchman Brook Dam)是一座26m高的填土坝,带有水坑黏土,蓄水量为2.2 GL。自1928年建造完成以来,已经进行了各种补救工作。2000年9月,在常规大坝检查中观察到右基台的下水道。在此事件之后,进行了详细的现场调查。这些研究表明,在粘土芯的上部形成了软区,并可能形成空隙。 2002/2003年进行的大坝安全综合研究和风险研讨会表明,大坝在与管道,溢洪道充足性和出水口工程状况有关的方面都存在缺陷。在设计阶段的早期阶段,就安全性和经济性两方面达成了一套合理的设计标准。利用1980年代的三轴试验数据和最近的研究为基础开发了合理的岩土模型。现有的溢洪道溜槽将进行升级,并在现有的溜槽上安装混凝土衬里,其中结合了无细混凝土作为自由排水介质。本文介绍了补救工作的各个方面,主要着眼于设计标准的发展,同时考虑了大坝的安全性和拟议补救工作的经济性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号