首页> 外文会议>International Conference on Copper 2003-Cobre 2003 v.1; 20031130-20031203; Santiago; CL >Imitation-optimizing planning of winning operations at open casts
【24h】

Imitation-optimizing planning of winning operations at open casts

机译:模仿优化的露天矿获胜运营计划

获取原文
获取原文并翻译 | 示例

摘要

In the paper worked out by authors system of automated development of annual and one-week-twenty-four-hour plans of mining operations when open mining of complex-structural multi-components copper, iron and poly-metallic ores deposits is presented. This system includes two main programming-functional complexes: optimization and imitation. Optimization complex is based on optimizing of development of mining operations by economic-mathematical model concerning class of partially integer linear programming with integer and Boolean variables. Imitation complex is based on imitation of graphical constructions and calculations, which are carried out by process engineer in interactive regime with using of optimizing model when development of annual and one-week-twenty-four-hour plans of mining operations. For adequate description of complex interconnections between technological parameters and processes at open cast in economic-mathematical model it is necessary using of non-simple logical and calculating techniques and procedures.
机译:在作者提出的论文中,提出了在复杂结构的多组分铜,铁和多金属矿石矿床进行露天开采时,自动制定年度采矿计划和一周二十四小时采矿计划的系统。该系统包括两个主要的编程功能复合体:优化和模仿。优化综合体是基于涉及具有整数和布尔变量的部分整数线性规划类别的经济数学模型对采矿作业的发展进行优化。模仿综合体是基于图形构造和计算的模仿,过程工程师在制定年度和每周一至二十四小时的采矿作业计划时,使用优化模型在交互方式下进行交互。为了充分描述经济数学模型中露天生产时工艺参数与过程之间的复杂相互联系,有必要使用非简单的逻辑和计算技术与程序。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号