首页> 外文会议>International Conference on Continuous Casting of Steel in Developing Countries(CCC'04); 20040914-17; Beijing(CN) >The Production Practice of the Continuous Casting Machine in Bengang and the Study for Quality of Slab
【24h】

The Production Practice of the Continuous Casting Machine in Bengang and the Study for Quality of Slab

机译:本钢连铸机的生产实践及板坯质量研究

获取原文
获取原文并翻译 | 示例

摘要

The main body equipments of casting machine at Benxi Steel-Making are designed and manufactured by VOEST-ALPINE Industieanlagenbau GmbH & Co. (VAI). The first casting machine was put into production on November 15,1998 and the second one was on September 20, 2000. By far, the two casting machines run very well beyond the designed capacity. We have received remarkable achievements with the two casting machines owing to the short construction period, successful function test, fast running speed, good quality of slab and low break-out rate. It introduces in the article the technical specialty of the casting machines in Benxi as well as the production practice since their putting into production.
机译:本溪炼钢厂铸造机的主体设备是由VOEST-ALPINE Industieanlagenbau GmbH&Co.(VAI)设计和制造的。第一台铸造机于1998年11月15日投入生产,第二台铸造机于2000年9月20日投入生产。到目前为止,两台铸造机的运行状况都超出了设计能力。由于这两台铸造机的工期短,功能测试成功,运行速度快,铸坯质量好,开裂率低,我们在两台铸造机上都取得了令人瞩目的成就。文中介绍了本溪铸造机的技术特点以及投产以来的生产实践。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号