INFORMATION REUSE MECHANISM FOR A MANAGEMENT INFORMATION SYSTEM: EPIMS

机译:管理信息系统的信息重用机制:EPIMS

获取原文
获取原文并翻译 | 示例

摘要

The mass information generated in the construction phase includes documents such as a bill of quantities and drawings, records of construction and so on. Since this set of information covers the whole construction process of the project and all parties related to the project, it is expected to be useful after the project is finished. A management information system named EPIMS has been developed to support the collaborative work and the sharing of project information through Internet among the multi-party in constructive phase. This paper focuses on the reuse of the project information from EPIMS. The information reuse mechanism is established, and then a system approach to the information reuse is proposed. Finally, a prototype system called EXPLYZER is analyzed and the relative important issues are clarified.
机译:在施工阶段生成的质量信息包括诸如工程量清单和工程图,施工记录等文件。由于这套信息涵盖了项目的整个建设过程以及与项目有关的所有各方,因此预计在项目完成后会很有用。已经开发了一个名为EPIMS的管理信息系统,以在建设阶段支持多方之间的协作工作和通过Internet共享项目信息。本文着重于EPIMS中项目信息的重用。建立了信息复用机制,提出了一种信息复用的系统方法。最后,分析了称为EXPLYZER的原型系统,并阐明了相对重要的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号