【24h】

CIVIL BUILDINGS WITH STEEL STRUCTURES

机译:钢结构民用建筑

获取原文
获取原文并翻译 | 示例

摘要

The analysed multi-storey building has a dual structural system composed of moment resisting frames and eccentrically braced frames. The presence in the link zone of two materials, among which one is heterogeneous, with very different elasticity modulus and with different behaviour at cyclic moments, leads to a poor computation control of the behaviour of all these zones. Along the links length, the concrete will not be connected by connectors to the steel beams, in order to enable only to the steel element (link) to perform the plastic hinges. Numerical testing has been performed with short links, two hypotheses, with or without reinforced concrete slabs being studied. Is to be noted that the dissipative element has not been practically loaded, the loads acting on the floor being transmitted to the link ends due to the existing secondary beams.
机译:所分析的多层建筑具有双重结构体系,由抗弯框架和偏心支撑框架组成。两种材料在连接区域中的存在,其中一种是不均匀的,具有非常不同的弹性模量,并且在循环力矩下具有不同的行为,这导致对所有这些区域的行为的较差的计算控制。沿着连接长度,混凝土将不会通过连接器连接到钢梁上,从而仅使钢元件(连接)能够执行塑料铰链。在短链环,两个假设条件下进行了数值测试,无论是否研究钢筋混凝土板。要注意的是,耗散元件实际上没有被加载,作用在地板上的负载由于存在的副梁而被传递到连杆端。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号