首页> 外文会议>国际选煤大会暨展览会; 20061017-20; Beijing(CN) >Rehabilitation of the Ombilin Coal Preparation Plant with Automatic Jig Controller in Indonesia
【24h】

Rehabilitation of the Ombilin Coal Preparation Plant with Automatic Jig Controller in Indonesia

机译:在印度尼西亚使用自动夹具控制装置对Ombilin选煤厂进行修复

获取原文
获取原文并翻译 | 示例

摘要

In this study, a control system incorporating the know-how of the skilled operators using fuzzy logic is applied by using on-line ash monitors as a jig control system sensor to the rehabilitation of a coal preparation plant of the Ombilin Mine in Indonesia. The computer simulation experiments demonstrate that the immediate response can be improved by means of modification of the fuzzy rules. Based on the results of the simulation experiments, it is clear that the present proportional/ integral-operation fuzzy control system is effective in mitigating the long down-time due to the sampling interval of the ash monitor, and also in mitigating the parameter variations due to the properties of raw coal. Demonstration experiments conducted with real equipment on-site realized that the jig control system using on-line ash monitors was capable of being applied to an actual coal preparation plant.
机译:在这项研究中,通过使用在线灰分监测器作为夹具控制系统传感器,将结合了模糊逻辑的熟练操作员知识的控制系统应用于印尼Ombilin矿的选煤厂的修复。计算机仿真实验表明,通过修改模糊规则可以改善即时响应。根据仿真实验的结果,很明显,本比例/积分运算模糊控制系统可有效地减轻由于灰分监测器采样间隔而导致的长时间停机,并且还可以有效地减轻因灰分监测器而引起的参数变化。对原煤的特性。在现场使用实际设备进行的演示实验表明,使用在线灰分监测器的夹具控制系统可以应用于实际的选煤厂。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号