【24h】

NASA Crew Launch Vehicle Flight Test Options

机译:NASA乘员运载火箭飞行测试选项

获取原文
获取原文并翻译 | 示例

摘要

Options for development flight testing (DFT) of the Ares I Crew Launch Vehicle (CLV) are discussed. The Ares-I Crew Launch Vehicle (CLV) is being developed by the U.S. National Aeronautics and Space Administration (NASA) to launch the Crew Exploration Vehicle (CEV) into low Earth Orbit (LEO). The Ares-I implements one of the components of the Vision for Space Exploration (VSE), providing crew and cargo access to the International Space Station (ISS) after retirement of the Space Shuttle and, eventually, forming part of the launch capability needed for lunar exploration. The role of development flight testing is to demonstrate key sub-systems, address key technical risks, and provide flight data to validate engineering models in representative flight environments. This is distinguished from certification flight testing, which is designed to formally validate system functionality and achieve flight readiness. Lessons learned from Saturn V, Space Shuttle, and other flight programs are examined along with key Ares-I technical risks in order to provide insight into possible development flight test strategies. A strategy for the first test flight of the Ares I, known as Ares I-1, is presented.
机译:讨论了Ares I Crew运载火箭(CLV)的开发飞行测试(DFT)的选项。美国国家航空航天局(NASA)正在开发Ares-I载人运载火箭(CLV),以将载人探索运载工具(CEV)送入低地球轨道(LEO)。 Ares-I实施了太空探索愿景(VSE)的组成部分之一,在航天飞机退役后为机组人员和货物提供了进入国际空间站(ISS)的通道,并最终形成了所需的发射能力的一部分月球探索。开发飞行测试的作用是演示关键子系统,解决关键技术风险,并提供飞行数据以验证具有代表性的飞行环境中的工程模型。这不同于认证飞行测试,后者旨在正式验证系统功能并实现飞行准备。考察了从土星五号,航天飞机和其他飞行计划中学到的经验教训以及主要的Ares-I技术风险,以便深入了解可能的开发飞行测试策略。提出了战神I首次试飞的战略,称为战神I-1。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号