CHANCES IN THE SEDIMENT MANAGEMENT OF AN ALPINE RESERVOIR

机译:阿尔卑斯山水库沉积物管理的变化

获取原文
获取原文并翻译 | 示例

摘要

The runoff from Austria's largest glacier, Pasterze, is collected in the Margaritze reservoir. From there, the 11.6-km long M611 gallery diverts the flows to the Wasserfallboden and Mooserboden high-level reservoirs of the Glockner-Kaprun group of power schemes. Having a capacity of no more than 3.2 million cubic metres, the Margaritze reservoir offers little space for holding the substantial amounts of sediments contained in the glacial runoff. In the past, reservoir sedimentation already caused problems in the operation of the bottom outlet and necessitated its structural conversion. For more than 13 years, owner Verbund Austrian Hydro Power AG (AHP) has conducted studies to develop an efficient sediment management scheme for this reservoir. The studies have yielded various ideas regarding possible remedial action in this particular situation. Some of the solutions considered have already been applied, others are still at the planning stage. This paper focuses on one specific measure, that is, the conveyance of deposited sediments, by a submersible pump fixed to a pontoon, to the 11.6-km diversion gallery to transfer part of the sediment load to the two reservoirs in the Kaprun valley.
机译:奥地利最大的冰川Pasterze的径流收集在玛格丽兹水库中。从那里开始,长11.6公里的M611画廊将水流引到Glockner-Kaprun电力计划组的Wasserfallboden和Mooserboden高级水库。玛格丽兹水库的容量不超过320万立方米,几乎没有空间容纳冰川径流中包含的大量沉积物。过去,储层沉积已经在底部出口的操作中引起问题,并且需要对其结构进行改造。业主Verbund Austrian Hydropower AG(AHP)进行了13多年的研究,为该水库制定了有效的泥沙管理方案。研究针对这种特殊情况下可能采取的补救措施提出了各种想法。所考虑的某些解决方案已经应用,其他解决方案仍处于计划阶段。本文着重介绍一种具体措施,即通过固定在浮筒上的潜水泵将沉积的沉积物输送到11.6公里的导流廊道,以将部分沉积物负荷转移到Kaprun山谷的两个水库中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号