【24h】

New Bridges on the Hungarian Reach of Danube River

机译:匈牙利多瑙河河上的新桥

获取原文
获取原文并翻译 | 示例

摘要

The Hungarian Parliament enacted a new bill on the development of the motorway network. According to it, the total length of Hungarian expressways shall be doubled by the end of 2007. Within the program, three new bridges should be built over the Danube River. The Northern Bridge of MO motorway around Budapest will be a cable-stayed bridge with steel deck and concrete towers. It should be constructed parallel with the Danube bridge at Dunaujvaros of the M8 motorway that is a through type steel bowstring arch with 307.8 m world record main span length. Also the third Danube Bridge will be at Budapest, on the Southern section of MO circular motorway, where the existing steel girder bridge should be widened by constructing alongside a new steel bridge with orthotropic deck plate.
机译:匈牙利国会通过了关于高速公路网络发展的新法案。据此,到2007年底,匈牙利高速公路的总长度将增加一倍。在该计划内,应在多瑙河上建造三座新桥。围绕布达佩斯的MO高速公路北桥将是一座斜拉桥,带有钢甲板和混凝土塔。它应与M8高速公路Dunaujvaros的多瑙河桥平行建造,该桥是直通式钢弓弦拱,具有307.8 m的世界纪录主要跨度。第三座多瑙河大桥也将在MO环形高速公路南部的布达佩斯,在那里,应通过与一座带有正交各向异性桥面板的新钢桥一起建造来拓宽现有的钢梁桥。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号