【24h】

Proposed Bridge in Shanghai Chongming Rivercrossing Project

机译:上海崇明渡河工程拟建桥梁

获取原文
获取原文并翻译 | 示例

摘要

Shanghai Chongming Rivercrossing Project runs across the South and North Channels at the Yangtze Estuary, connecting the land area of Shanghai, Changxing Island and Chongming Island, approximately 25.5km in total length, of which, the water area of the South Channel to be covered is 6.87km and Feasibility Study finished. In the F.S. Report, 4 overall proposals are raised along two proposed that of the North Channel is 8.45km. The project has been approved and its alignments, including large amounts of study and comparison thereof. Briefed here is the construction conditions and key technical indices, with emphasis on the size and technical features of the proposed bridges on the two alignments.
机译:上海崇明河道工程横跨长江口南北通道,连接上海,长兴岛和崇明岛的陆地区域,全长约25.5km,其中要覆盖的南通道水域为6.87公里,可行性研究完成。在F.S.报告中,共提出了4项总体建议,其中两项建议北通道为8.45km。该项目及其组合已经获得批准,包括大量的研究和比较。这里简要介绍了施工条件和关键技术指标,重点介绍了两个路线上拟建桥梁的尺寸和技术特点。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号