首页> 外文会议>International Association for Bridge and Structural Engineering(IABSE) Symposium; 20040922-24; Shanghai(CN) >Rehabilitation of the Roof Structure at the Sports Center -'11 April', in Belgrade
【24h】

Rehabilitation of the Roof Structure at the Sports Center -'11 April', in Belgrade

机译:贝尔格莱德体育中心“ 4月11日”屋顶结构的修复

获取原文
获取原文并翻译 | 示例

摘要

In this paper, we have presented remedial measures of the roof structure at the Sports Center - 11 April, in Belgrade. The building structure was made of glued laminated wood, in 1977. During to exploitation, the structure was exposed to extreme climate influences, due to its inadequate protection, as well as due to great damages on the roof insulation. Damages at the bearing structure had reached such proportions that the safety of the whole structure was at stake, and the building had to be put out of use. By extensive remedial measures at the roof structure, the building has been put into previous use.
机译:在本文中,我们介绍了4月11日在贝尔格莱德体育中心的屋顶结构的补救措施。该建筑结构是在1977年由胶合层压木制成的。在开发过程中,该结构由于保护不足以及屋顶隔热层受到很大破坏而受到极端气候的影响。支座结构的损坏程度已达到使整个结构的安全受到威胁的程度,必须停止使用该建筑物。通过对屋顶结构的大量补救措施,该建筑物已投入使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号