Surge analysis during making-operation of circuit breaker in 345kV network

机译:345kV电网断路器合闸时的浪涌分析

获取原文

摘要

In this paper, the analysis results of theswitching surge in substation included gas insulatedswitchgear by using the electromagnetic transientprogram has been described. After performing themodeling of the input data, we have calculated theenergizing and re-energizing overvoltage of gas circuitbreaker without closing resistor of circuit breaker in345kV network between Sanchung and Ueryoung,according to closing time of simultaneously operatingswitch. Then we statistically calculated the energizingovervoltage. From these results, it could be knownthat the phase-to-earth energizing overvoltagesbetween Sanchung and Ueryoung are less than 2.2 p.uwhen closing resistor of circuit breaker is eliminated.Therefore, it was possible to eliminate the closingresistor of circuit breaker in Sanchung power plant.
机译:本文利用电磁暂态程序,对包含气体绝缘开关设备的变电站的开关浪涌进行了分析。在对输入数据进行建模后,根据同时工作的开关合闸时间,计算了三重至乌荣之间345kV电网中不闭合断路器电阻的气体断路器的励磁和再励过电压。然后我们统计地计算出过电压。从这些结果可以看出,在消除断路器的合闸电阻后,三重与乌荣之间的相间励磁过电压小于2.2 p。因此,可以消除三重电厂的断路器合闸电阻。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号