首页> 外文会议>Innovative infrastructures-toward human urbanism >Yi Sun-sin Bridge: Several Unique Features on the Cable Erection Procedure
【24h】

Yi Sun-sin Bridge: Several Unique Features on the Cable Erection Procedure

机译:易新仙桥:电缆安装程序的几个独特功能

获取原文
获取原文并翻译 | 示例

摘要

Although four suspension bridges have already been built in Korea, constructing the Yi Sun-sinrnBridge is a great challenge not only because its main span length of 1545m is almost three timesrnas long as the previous longest suspension bridge in Korea, but also because it is the firstrnsuspension bridge for which Korean engineers solely carried out all of the construction tasks,rncreating their own equipment and devices for the cable erection process as well. In this paper,rnseveral unique features pertaining to the cable erection procedures are introduced instead of therndetails of ordinary cable erection procedures, which are not very different from those of otherrnlong-span suspension bridges. An improved spinning wheel, a wire supply method for thernspinning of extra- strands, and a band-hanger installation method are described.
机译:尽管韩国已经建造了四座悬索桥,但建造伊孙神桥是一个巨大的挑战,这不仅是因为其主跨长1545m是韩国以前最长的悬索桥的三倍之长,而且还因为它是韩国工程师独自完成所有施工任务的第一座悬索桥,还为电缆安装过程创建了自己的设备。在本文中,介绍了与电缆安装程序有关的几个独特功能,而不是与其他大跨度悬索桥没有太大区别的普通电缆安装程序的详细信息。描述了一种改进的纺丝轮,用于多余丝的纺丝的送丝方法以及带架安装方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号