首页> 外文会议>Innovate integrate amp; invigorate >Idaho National Engineering and Environmental Laboratory Pilot Project An Integrated Approach to Accelerate Facility Disposition
【24h】

Idaho National Engineering and Environmental Laboratory Pilot Project An Integrated Approach to Accelerate Facility Disposition

机译:爱达荷州国家工程和环境实验室试点项目加快设施处置的综合方法

获取原文
获取原文并翻译 | 示例

摘要

Over the next 70 years the US Department of Energy (DOE) will spend more than $50 billion to deactivate, decommission and dismantle (D&D) facilities throughout its complex of production sites and Laboratories. This amount of funding will be difficult to obtain in an era of level or declining Federal budget. Therefore, the DOE must find more efficient, less costly ways to dispose of excess facilities. The Idaho National Engineering and Environmental Laboratory (INEEL) Pilot Project demonstrated an innovative, integrated, systems approach that offers opportunities to achieve significant savings in the long term. The INEEL concluded that this methodology would achieve significant efficiencies and improvement in their baseline over the life of the D&D program.
机译:在接下来的70年中,美国能源部(DOE)将花费超过500亿美元在其生产基地和实验室的整个范围内停用,停用和拆除(D&D)设施。在联邦预算水平下降的时代,很难获得这笔资金。因此,DOE必须找到更有效,成本更低的方式来处理多余的设施。爱达荷州国家工程和环境实验室(INEEL)试点项目展示了一种创新的,集成的系统方法,该方法为长期实现显着节省提供了机会。 INEEL的结论是,这种方法将在D&D计划的整个生命周期内显着提高效率并改善其基准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号