MULTI-PHASE SEISMIC ACQUISITION IN EAST KALIMANTAN THE PLANNING STAGE

机译:东加里曼丹的多阶段地震采集计划阶段

获取原文
获取原文并翻译 | 示例

摘要

Unocal Indonesia will acquire approximately 220 km~2 of 3D seismic data in the Northern In-board area between Bontang and Santan in East Kalimantan in 2003. The area is composed of land, transition zone and shallow water environments. A comprehensive planning program was undertaken to better understand the critical issues that would ensure the successful completion of the survey. The goal of the seismic survey is to acquire seamless full fold seismic coverage from the beach through an existing marine 3D survey. The goal of the planning program was to allow the seismic contractor to meet the imaging objectives without interruption to the survey. The major components of the planning program are environmental, community relations, government relations and technical. The environmental effort was focused acquiring detailed bathymetry and coral reef distribution data. The community relations efforts focused on making contractual agreements with the local communities throughout the survey area. These agreements were required to conform to Indonesian law and Unocal corporate policy. The government relations program is closely tied to the community relations efforts but also include strict adherence to the Migas explosive handling, permitting and security guidelines. Technical planning involved a detailed review of existing 2D seismic data and illumination studies. Detailed planning is essential to the success of a 3D seismic survey of this complexity. Production acquisition will begin in September of 2003 and it is considered that the planning program will have provided the necessary basis for a high quality 3D result.
机译:印度尼西亚Unocal将于2003年在东加里曼丹的Bontang和Santan之间的北部内侧区域采集约220 km〜2的3D地震数据。该区域由土地,过渡带和浅水环境组成。进行了一项全面的计划计划,以更好地理解将确保成功完成调查的关键问题。地震勘测的目标是通过现有的海洋3D勘测从海滩获取无缝的全地震覆盖。规划计划的目标是使地震承包商能够在不中断勘测的情况下达到成像目标。规划计划的主要组成部分是环境,社区关系,政府关系和技术。环保工作的重点是获取详细的测深和珊瑚礁分布数据。社区关系工作的重点是在整个调查区域与当地社区达成合同协议。要求这些协议符合印度尼西亚法律和Unocal公司政策。政府关系计划与社区关系工作紧密相关,但也严格遵守Migas爆炸物处理,许可和安全准则。技术规划涉及对现有2D地震数据和照明研究的详细审查。详尽的计划对于这种复杂性的3D地震勘测的成功至关重要。批量生产将从2003年9月开始,并且认为该计划计划将为高质量3D结果提供必要的基础。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号