State-of-the-art boiler feed pump upgrade for Ratcliffe Power Station

机译:拉特克利夫电站最先进的锅炉给水泵升级

获取原文
获取原文并翻译 | 示例

摘要

The FR 375 main feed pump is a design originating from the early 1960's. It was essentially a design for base load 2,000 MW power stations and this particular design was installed at both Ratcliffe and Ferrybridge. With good operational practice and steady state, high load rating conditions, it is not uncommon for these pumps to have an operational life of about 40,000 hours before a refurbishment is required. The power generation market conditions now dictate that 2,000 MW stations work ever more flexibly, two shifting operation of the plant and low/intermediate load operation is now commonplace. This places more onerous requirements on the main feed pumps such that the pumps provide the required boiler feed under all operational conditions. The operational envelope of the main feed pumps at Ratcliffe now needs to be widened to allow generation between about 180 MW to 520 MW with the pumps operating at the best compromise of efficiency. This paper presents the need to upgrade the existing pumps, along with the hydraulic design and development activities required to provide a pump designed for the flexible operation. The state-of-the art design is discussed along with the extensive site work required to allow the 35 year old barrel casings to accept a modern day boiler feed pump cartridge.
机译:FR 375主给水泵是源自1960年代初期的设计。它本质上是针对2,000 MW基本负荷电站的设计,并且该特殊设计已安装在Ratcliffe和Ferrybridge上。凭借良好的操作规范和稳定的状态,高额定载荷条件,这些泵在需要翻新之前的使用寿命约为40,000小时,这并不罕见。现在,发电市场条件要求2,000 MW电站的运行更加灵活,电厂的两次转换操作和低/中负荷运行现在很普遍。这对主给水泵提出了更苛刻的要求,以使这些泵在所有运行条件下都能提供所需的锅炉给水。拉特克利夫(Ratcliffe)的主给水泵的运行范围现在需要扩大,以允许在约180 MW至520 MW的范围内发电,并且以最佳的效率折衷运行。本文提出了对现有泵进行升级的需求,以及提供为灵活操作而设计的泵所需的液压设计和开发活动。讨论了最先进的设计,以及允许35年使用的桶形外壳接受现代锅炉给水泵筒所需的大量现场工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号