Extension Hill Direct Ship Iron Ore Project – Seven Years in the Making

机译:扩展山直船铁矿石项目–建成七年

获取原文
获取原文并翻译 | 示例

摘要

Direct ship iron ore (DSO) operations at Extension Hill in Western Australia's Midwest regionrnhave commenced, with fi rst product railed to the port of Geraldton in July 2011. Reserves arern14.8 million tonnes (Mt) of haematite-goethite ore overlying an Archaean BIF-hosted largerrnmagnetite deposit which Mount Gibson Iron Limited (MGI) sold to other parties in 2006.rnSome unique geological aspects of the deposit shape DSO mining and processing operations.rnOwner-operator selective mining, blending, crushing and screening on site will produce threernmillion tonnes per year (Mt/a) of Lump and Fines product to be trucked 86 km to Perenjori, railedrn232 km to Geraldton, and loaded aboard Panamax-sized ships through the dedicated iron orernshiploader at the Geraldton Port Authority's Berth 5 facility.rnThe statutory approvals process for this project formally began in 2004, dominating delays in arnpredevelopment phase which extended over a longer period than the likely life of DSO operations.rnThe lack of transparency, uncertainties and costs inherent in state government processes haverninfl uenced decisions made by MGI while assessing other development opportunities in WesternrnAustralia. Potential for additional Reserves exists at Extension Hill, however MGI's ability to extendrnthe mine life will hinge on statutory approval to explore for and evaluate other DSO resources onrnsurrounding granted mining leases.rnThe nature of the resource and use of existing infrastructure for product transport have enabledrnMGI to keep operating costs and capital intensity of this project relatively low. A tenaciousrndevelopment approach by MGI and robust project economics have fi nally enabled this site to takernits place as a revenue earner beside the company's other DSO operations at Tallering Peak andrnKoolan Island.
机译:西澳大利亚州中西部地区Extension Hill的直接铁矿石(DSO)业务已经开始,第一批产品于2011年7月驶入Geraldton港口。储量为1,480万吨赤铁-针铁矿矿石,覆盖在太古BIF上拥有较大的磁铁矿,吉布森山铁矿有限公司(MGI)于2006年将其出售给其他方。矿床形状DSO开采和加工业务的某些独特地质方面。现场所有者/经营者选择性开采,混合,压碎和筛选将产生30亿吨每年将(整吨/年)整块和上等产品运到佩伦乔里(Perenjori)86公里,铁路到杰拉尔顿(Geraldton)232公里,并通过杰拉尔顿港口管理局(Geraldton Port Authority)的5号泊位的专用铁载货船装载巴拿马型船.rn该项目于2004年正式开始,主要是由于arnpredevelop阶段的延迟,该延迟比DSO运营的可能期限更长。 ns.rn州政府流程内在的透明度,不确定性和成本的缺乏影响了MGI做出的决定,同时评估了澳大利亚西部地区的其他发展机会。延伸山存在增加储量的潜力,但是MGI延长矿山寿命的能力将取决于法定许可,以围绕授予的采矿租约勘探和评估其他DSO资源。资源的性质和现有产品运输基础设施的使用使MGI能够保持该项目的运营成本和资金强度相对较低。 MGI的顽强开发方法和稳健的项目经济学最终使该地点成为了公司在Tallering Peak和rnKoolan Island的其他DSO业务旁边的创收者。

著录项

  • 来源
    《Iron ore 2011》|2011年|p.625-631|共7页
  • 会议地点 Perth(AU)
  • 作者

    R Forster;

  • 作者单位

    Mount Gibson Iron Limited, PO Box 55, West Perth WA 6872. Email: Rolf.Forster@iinet.net.au;

  • 会议组织
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 铁矿石;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号