首页> 外文会议>IEEM'2010;IEEE International Conference on Industrial Engineering and Engineering Management >Application Research of Shortening Delivery Time through Value Stream Mapping Analysis
【24h】

Application Research of Shortening Delivery Time through Value Stream Mapping Analysis

机译:价值流图分析缩短交货期的应用研究

获取原文

摘要

Value stream mapping is a kind of technique that helps to understand and streamline production processes. With a case study of a metal machinery factory, the production process path is visualized by mapping the current state value stream. After tracking the production process of a medium-sized order, problems affecting the delivery time are identified and its causes analyzed. A future state value stream map is created and an optimization scheme is suggested, with which the production cycle of the order is expected to be shortened from 21 days to 9 days, representing a 57% reduction. Value stream mapping is proved as a useful technique to shorten delivery time and reduce production costs.
机译:价值流映射是一种有助于理解和简化生产过程的技术。以一家金属机械厂为例,通过映射当前状态值流来可视化生产过程路径。在跟踪中型订单的生产过程之后,找出影响交货时间的问题并分析其原因。将创建将来的状态值流图并提出优化方案,通过该方案可以将订单的生产周期从21天缩短到9天,减少了57%。价值流映射被证明是缩短交付时间并降低生产成本的有用技术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号