首页> 外文会议>2019 IEEE International Conference on Industrial Cyber Physical Systems >A rule for lead time estimation in general production shops
【24h】

A rule for lead time estimation in general production shops

机译:一般生产车间中提前期估算的规则

获取原文
获取原文并翻译 | 示例

摘要

We consider the problem of estimating lead times of jobs that arrive dynamically in a production shop. The lead time of a job refers to the duration between the job's arrival and completion. To improve accuracy of estimation and generality of application, we propose a new rule that takes into account parallelization of waiting queues in the system and job-specific sequence of visiting workstations. We carry out extensive experiments to evaluate performance of the rule, and the results suggest that the rule is high-performing in production shops including single-machine shops, parallel-machine shops, flexible flow shops, and flexible job shops. We further provide the mean of best values found for the parameters in the proposed rule under three performance measures: relative error ratio, mean tardiness ratio, and percentage of tardy jobs, respectively, to help users determine the parameters according to their needs.
机译:我们考虑估算在生产车间中动态到达的作业的提前期的问题。作业的提前期是指作业到达和完成之间的持续时间。为了提高估计的准确性和应用程序的通用性,我们提出了一条新规则,该规则考虑了系统中等待队列的并行化以及访问工作站的特定于工作的顺序。我们进行了广泛的实验以评估该规则的性能,结果表明该规则在生产车间(包括单机车间,并行机车间,柔性流水车间和柔性作业车间)中表现良好。我们进一步提供建议的规则中的参数在三个性能指标下的最佳值的平均值,分别是相对误差率,平均迟滞率和作业时间百分比,以帮助用户根据需要确定参数。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号