Practical experience of using additional earthing of the faulty phase during a ground fault

机译:在接地故障期间使用故障相的额外接地的实践经验

获取原文

摘要

The paper is focused on the operational experience with an automatic system for suppression of a fault current during a ground fault by the additional earthing of the faulted phase in a supply substation. Such system was experimentally installed in the Brno-Medlánky 110/22 kV substation. To verify the benefits of the system as well as to assess its possible failings, twenty-four experimental measurements based on a theoretical study were performed. During those experiments, low-resistance and arc ground faults were monitored in the urban and suburban part of the compensated network with a capacitive current of 300 A and 800 A. The results of the crucial experiments and the evaluation of the system functioning are summed up in the final part of the paper.
机译:本文的重点是自动系统的运行经验,该系统可通过供电变电站中故障相的额外接地来抑制接地故障期间的故障电流。该系统通过实验安装在Brno-Medlánky110/22 kV变电站中。为了验证该系统的优势并评估其可能的故障,基于理论研究进行了二十四次实验测量。在这些实验中,以300 A和800 A的电容电流在补偿网络的市区和郊区监测了低电阻和电弧接地故障。总结了关键实验的结果以及对系统功能的评估。在本文的最后部分。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号